EasyManua.ls Logo

HP ProLiant DL120 G7 - Page 43

HP ProLiant DL120 G7
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware options installation 43
o
Foam air baffle for an eight-bay SFF drive cage
19. Install the access panel (on page 18).
20. Install the server into the rack ("Installing the server into the rack" on page 25).
21. Depending on the configuration, install either two power supplies, or one power supply blank and one
power supply.
o Power supply blank

Table of Contents

Other manuals for HP ProLiant DL120 G7

Related product manuals