Coordinating construction efforts
Primary liaison with Hewlett-Packard representatives
Principal Operator
The Principal Operator is responsible for the following tasks:
•System operation
Monitoring site preparation
Ordering computer supplies
Scheduling user training
Maintaining maintenance schedules
Site Planning Team
The Site Planning Team is responsible for the following tasks:
Determining site location and size
Reviewing construction requirements
Reviewing local codes
Reviewing insurance requirements
Scheduling all events related to site completion
Members of the Site Planning Team should include the Site Coordinator,
Principal Operator, and the Hewlett-Packard Site Preparation Specialist.
When possible, the electrical contractor, a site construction coordinator
(familiar with local electrical codes), and an air conditioning specialist
should be included.