1
Review the Sales Order
Customer sales order information is available through the Support
Connect system and through the WWOMS (World-Wide Order
Management System). Carefully review the sales order information to
assess:
the number of integrated systems ordered
the number of peripheral cabinets ordered
the number and type of PDUs
special configuration requirements
•delivery dates

Other manuals for HP rp7400

Question and Answer IconNeed help?

Do you have a question about the HP rp7400 and is the answer not in the manual?

HP rp7400 Specifications

General IconGeneral
Form FactorRack-mountable
MemoryUp to 64 GB
Memory TypeSDRAM
Storage InterfaceSCSI
Network InterfaceIntegrated 10/100/1000 Ethernet
Operating SystemHP-UX, Linux, Windows
ChipsetHP custom chipset
Dimensions17.5 x 19 x 29 in (44.45 x 48.26 x 73.66 cm)

Summary

Plan the Site Visit

Verify system complicity with regulatory standards

Develop the Schedule

Specify Hard Floor Requirements

Specify Power Protection

Specify the System Requirements

Determine the ESD Requirements

Determine RFI Requirements

Determine Fire Protection Requirements

Generate the Plan

Design computer room layout

Guidance on creating a computer room layout using software or templates.

Execute the Site Plan

Review HP Responsibilities

Site Planning Visit

HP's role in on-site meetings for system planning and preparation.

Site Verification Visit

HP's verification of site readiness for installation.

Specify the Space for Unpacking

Specify Raised Floor Requirements

Specify Loading Requirements

Specify Power Connections

Specify Grounding Requirements

Power distribution safety grounding

Connecting system components to earth ground for safety.

Main building electrical ground

Ensuring an earth ground connection for main electrical service entrance.

Computer equipment ground

Grounding all computer equipment via branch circuitry.

Raised floor grounding

Grounding grid requirements for raised floor systems.

Equipment grounding implementation details

Identify the High Availability Requirements

SPU-level Enhanced Power Availability

Achieving power availability through n+1 hot-swappable power supplies.

Cabinet-level Enhanced Power Availability

Enhancing power availability by distributing cords across different branch circuits.

Determine the Acoustic Requirements

Determine Temperature/Humidity Requirements

Identify Sources of Electrical Interference

Determine Service Access Needs

Review the Plan With the Customer