EasyManua.ls Logo

HPE 5900 series

HPE 5900 series
75 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the switch
CAUTION: Keep the tamper-proof seal on a mounting screw on the chassis cover intact, and if you want to open the
chassis, contact Hewlett Packard Enterprise for permission. Otherwise, Hewlett Packard Enterprise shall not be liable for
any consequence caused thereby.
Figure 1: Hardware installation flow
Procedure
1.
Installing the switch in a 19-inch rack
2.
Grounding the switch
3.
Installing/removing a fan tray
4.
Installing/removing a power supply
5.
Connecting the power cord
6.
Verifying the installation
Installing the switch in a 19-inch rack
Procedure
1. Review the following:
12 Installing the switch

Table of Contents

Other manuals for HPE 5900 series

Related product manuals