11
Interconnect bay crosslinks
Interconnect bay crosslinks are wired between adjacent interconnect
bay pairs.
You can enable these signals to provide module-to-module
connections, such as Ethernet crosslink ports between matching
switches, or Virtual Connect modules as stacking links. Onboard
Administrator with KVM disables the interconnect bay crosslinks
when they cannot be used, such as when two different modules
reside in adjacent horizontal interconnect bays.
Installing interconnect modules
interconnect bay divider, press the release tab, and pull the
interconnect bay divider out of the enclosure.
2.
Install interconnect blanks in any unused interconnect bays.
3.
Connect each installed interconnect module to the external
connections with the appropriate cable.
Powering up the enclosure
Single-phase power configuration
For a single phase power configuration:
1.
Connect the AC power cables to the power connectors on the
rear of the enclosure corresponding to the power supply that
was populated on the front of the enclosure.
2.
Be sure each power cable is securely attached to the power
connectors.
3.
Connect the AC power cables to the AC power source or to an
installed power distribution unit (PDU).
4.
Turn on the AC circuit breakers that power the power cables
installed in the enclosure.
5.
Locate the power retention bracket that came with the
enclosure.
6.
Verify that the power cord retention tabs are on the correct
side.
o On the left side: To install the power cord retention bracket
on the left side of the enclosure, ensure the power cord
retention tabs are located to the right of the snap clamps.
Server blade
signal
Interconnect bay
number
Interconnect bay label
NICs 1, 2, 3, and 4
(embedded)
1, 2
Mezzanine 1
3, 4
Mezzanine 2 5, 6 and then 7, 8
Mezzanine 3 7, 8 and then 5, 6
NOTE: For information on the location of LEDs and
ports on individual interconnect modules, see the
documentation that ships with the interconnect module.
1.
Install the interconnect modules based on the number ordered
and the number of fabrics in the configuration.
The enclosure ships with interconnect bay dividers installed.
The interconnect bay dividers must be removed before
installing double-wide interconnect modules. To remove an

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HPE BladeSystem c7000 and is the answer not in the manual?

HPE BladeSystem c7000 Specifications

General IconGeneral
Form Factor10U
Interconnect Bays8
Blade Slots16 half-height or 8 full-height
Device Bays16 half-height blade server bays or 8 full-height blade server bays
Power SuppliesUp to 6 hot-plug power supplies
Cooling Fans10 hot-plug fans
ManagementOnboard Administrator
Height17.5 inches
Width17.6 inches
CompatibilityHPE ProLiant and Integrity server blades
Non-operating Temperature-40° to 70°C (-40° to 158°F)
Operating Humidity10% to 90% (non-condensing)
Non-operating Humidity5% to 95% (non-condensing)
NetworkingDependent on installed interconnect modules