Install two OT terminals on a post.
Before you install two OT terminals on a post, ensure that the two terminals can be installed
on the post and that the electrical connecting pieces have a large contact area. Two OT
terminals can be installed using any of these methods:
Bend the upper OT terminal at a 45- or 90-degree angle, as shown in Figure 5-46.
Cross the two terminals, as shown in Figure 5-47.
Figure 5-46 Bending the upper OT terminal at a 45- or 90-degree angle