LampSite Solution
Product Description
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Blinking on for
1s and off for 1s
The PSE is negotiating or faulty.
The RHUB is not supplying power to the
pRRU.
The CPRI link is functioning properly.
The CPRI link is out of lock or
disconnected possibly because of an
Ethernet cable disconnection or PHY
fault.
2.3.3 PSU
The PSU converts 110 V/220 V AC power into –53.5 V DC power.
Figure 2-5 shows the PSU exterior.
Figure 2-5 PSU exterior
The buckle and handle are used to physically install the PSU in the RHUB box.
Figure 2-6 shows the PSU indicators.
Figure 2-6 PSU indicators
1. Power supply indicator