EasyManua.ls Logo

Huawei PDU8000 - 3.3 Appearance

Huawei PDU8000
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
To the UPS output terminal block
5. To separate strong-current cables
from weak-current cables, route
the signal cables upwards along
the rack rail through the holes
reserved at the outer side.
6
Check Before Power-On Commissioning
No.
Check Item
Check Result
1
The PDC is clean and free of dust, dirt, and foreign matter.
Pass Fail
2
The paint on the cabinet exterior is intact.
Pass Fail
3
The cabinet door and lock work properly.
Pass Fail
4
All safety marks and warnings are correct, clear, and complete.
Pass Fail
5
There is no adhesive tape, cable tie, paper scrap, or packing
material around the cabinet.
Pass Fail
Verifying Hardware Installation
6.1
13
To the UPS input terminal block
4. Connect the UPS input and output power cables.
The actual number of cables to be
connected and the positions vary
depending on the project design.
Rear view
Rear view
Front view
NOTE

Other manuals for Huawei PDU8000

Related product manuals