5 Installation Process
The installation process involves installing an RRU and RRU cables, checking the RRU
hardware installation, and powering on the RRU.
Figure 5-1 shows the process of installing an RRU.
Figure 5-1 Process of installing an RRU
RRU3201
Installation Guide 5 Installation Process
Issue 06 (2012-04-16) Huawei Proprietary and Confidential