Do you have a question about the Huawei SUN2000-300KTL-H0 and is the answer not in the manual?
Model | SUN2000-300KTL-H0 |
---|---|
Type | String Inverter |
Rated Output Power | 300 kW |
Rated AC Output Power | 300 kW |
Max. AC Output Power | 330 kW |
Rated AC Grid Frequency | 50 Hz / 60 Hz |
AC Output Frequency | 50 Hz / 60 Hz |
Max Efficiency | 98.6% |
MPPT Efficiency | 99.9% |
Max. Total Harmonic Distortion | < 3% |
DC Switch | Yes |
Protection Class | I |
Ingress Protection | IP65 |
Operating Temperature Range | -25 °C to +60 °C |
Max. DC Input Power | 450000 W |
Maximum DC Input Power | 450000 W |
Max. Input Voltage | 1100 V |
Maximum DC Input Voltage | 1100 V |
Communication | Ethernet, RS485 |
Rated AC Voltage | 3 x 400 V |
Rated AC Output Voltage | 3 x 400 V |
Cooling | Natural Cooling |
Cooling Method | Natural Cooling |
Covers essential safety precautions for personnel during Sun2000 installation and operation, including PPE and electrical hazards.
Details critical safety measures related to electrical connections, grounding, and preventing shocks or fires.
Specifies the general requirements and conditions for installing the SUN2000 in various environments.
Guides on choosing an appropriate installation site, considering environmental factors and safety.
Details the necessary clearance distances around the SUN2000 for proper installation and heat dissipation.
Guides on the procedure for securely mounting the SUN2000 onto a support structure.
Details the process for installing the SUN2000 using a pole clamp mounting system.
Highlights critical safety precautions and requirements before performing any electrical connections on the SUN2000.
Provides instructions on how to prepare various cables, including DC input, RS485, PE, and AC output cables for connection.
Guides on connecting the AC output power cable to the SUN2000, including safety measures and switch requirements.
Details the procedure for connecting DC input power cables from PV strings to the SUN2000, emphasizing safety and polarity.
Provides a step-by-step guide for safely powering on the SUN2000 inverter, including switch operations and indicator checks.
Outlines the methods for commissioning the SUN2000, including using the SmartLogger WebUI or FusionSolar app.
Details the process of commissioning the SUN2000 using the SmartLogger, covering preparations, software upgrades, and wizard configurations.
Covers regular maintenance tasks for the SUN2000 to ensure its long-term proper operation and performance.
Provides instructions for safely powering off the SUN2000 before performing maintenance tasks.
Lists common alarms, their possible causes, and suggested troubleshooting steps for the SUN2000.