EasyManua.ls Logo

Huawei SUN2000-M1 - Physical Layout Configuration

Huawei SUN2000-M1
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
To create multiple
installer accounts for a
company, log in to the PV
Monitor app and tap Add
User to create an installer
account.
Installer
xxx
Creating a PV Plant and a Plant Owner
6.3
If Smart PV Optimizers are configured for PV strings, ensure that the Smart PV Optimizers
have been successfully connected to the solar inverter before performing the operations in
this section.
The PV strings connecting to the same MPPT route should contain the same number and
model of PV modules or Smart PV optimizers.
Check that the SN labels of Smart PV Optimizers are correctly attached to the physical layout
template.
Take and save a photo of the physical layout template. Place the template on a flat surface.
Keep your phone parallel to the template and take a photo in landscape mode. Ensure that
the four positioning points in the corners are in the frame. Ensure that each QR code is
attached within the frame.
For details about the physical layout of Smart PV Optimizers, see
FusionSolar App Quick
Guide
.
Setting the Physical Layout of Smart PV Optimizers
6.4
In the quick settings, the grid
code is set to N/A by default
(automatic startup is not
supported). Set the grid code
based on the area where the
PV plant is located.
For details, see the
FusionSolar App Quick Guide
.
You can scan the QR code to
download the quick guide.

Related product manuals