EasyManua.ls Logo

Husqvarna CTH135 - Vertical Adjustment

Husqvarna CTH135
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
ASSEMBLY
CLEVIS
PIN
RE TAIN ER
SPRING
1/4 X 2"
CARRIAGE
BOLTS
LOWER
BAGGER
TUBE
DUMP HANDLE
TUBE
6MM (1/4") - 9MM (3/8")
TOP SUR-
FACES EVEN
HOR I ZON TA L
AD JUST MENT
BRACKET
FRONT BAGGER TUBE
1/4 X 2"
CARRIAGE
BOLTS
1/4 LOCK
NUT
VERTICAL
AD JUST MENT
BRACK ET
FIG. 5
FIG. 7
TO ASSEMBLE BAGGER (See Figs. 5 & 6)
NOTE: For ease of assembly, you may wish to obtain the
assistance of another person when putting the bagger
to geth er.
Holes in front bagger tube are at an angle. Place front
bagger tube against lower bagger tube and check for
proper hole alignment before assembling bolts.
Assemble front and lower bagger tubes using four (4)
1/4 x 50,8mm carriage bolts and lock nuts supplied.
Tighten se cure ly.
Slide front and lower bagger tube assembly into the
bagger assemby.
Assemble front and upper bagger tubes using four (4)
1/4 x 50,8mm carraige bolts and lock nuts supplied.
Tighten se cure ly.
Slip all the vinyl bindings over the bagger tubes
Slide the bagger dump handle through the hole in the
bagger top, install the clevis pin and secure with retainer
spring.
NOTE: For future use, the clevis pin may be removed in
order to use the handle to clear the chute in the event it
has become clogged.
VINYL
BINDING
1/4 LOCK
NUT
FRONT BAGGER
TUBE
FIG. 6
BAGGER ADJUSTMENT (See Fig. 7)
For proper bag function and appearance, it may be nec-
es sary to adjust the bagger assembly. There should be 6mm
(1/4")-9mm (3/8") gap between the bagger top and fender
and the bagger top surface should be even with the top
surface of the fender. To adjust bagger position:
HORIZONTAL ADJUSTMENT
Slightly loosen the nuts securing the bagger RH and
LH hor i zon tal adjustment brackets. Loosen only enough
so the brackets keep their position, but allow them to
be moved.
Move the brackets the amount forward or back ward you
wish the bag assembly to move. Retighten the nuts
securely.
VERTICAL ADJUSTMENT
Slightly loosen the nuts securing the vertical adjust-
ment brackets. Loosen only enough so the brackets
keep their position, but allow them to be moved.
Move the brackets the amount up or down you wish the
bag assembly to move. Retighten the nuts securely.
Reinstall the bagger as sem bly and check the bagger
to fender fi t. If necessary, repeat the procedure until
proper fi t is attained.

Other manuals for Husqvarna CTH135

Related product manuals