EasyManua.ls Logo

Husqvarna DM430 - Operation Procedures; Pre-Operation Checks; Preparing for Inverted Drilling

Husqvarna DM430
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. Make sure that the product is installed correctly. The
drill bit and the drill stand must be attached correctly.
7. When you do inverted drilling, make sure that you
comply to the applicable instructions. Refer to
To
prepare the product for inverted drilling on page 10
.
8. Make sure that the water system is not damaged
and that it is connected to the product.
9. Do the daily maintenance. Refer to
Maintenance
schedule on page 14
.
10. Make sure that the PRCD is started. Refer to
PRCD
on page 7
and
To examine the PRCD on page 8
.
To use embedded connectivity
Note
This part is applicable only for products supplied
with embedded connectivity.
Note Radio transmission by the Bluetooth
®
function will
be enabled on the first time of connection to a power
outlet, and stay on after that.
1. Download the Husqvarna Fleet Services iOS or
Android app Husqvarna Fleet Services.
2. Go to Husqvarna Fleet Services website https://
fleetservices.husqvarna.com for more information.
To prepare the product for inverted
drilling
WARNING
Always use a slurry ring with a
sealing disc and a rubber washer during
inverted drilling. Water that enters the
product increases the risk of electrical
shock.
1. Clean the top of the slurry ring. All grease and dirt
must be removed.
2. Attach 2-sided adhesive tape or use spray glue
around the top opening of the slurry ring (A). Put the
sealing disc on the top opening as a cover (B).
Attach it tightly.
A
B
3. Look for the dimension of the core drill on the top of
the drill.
4. Cut a hole in the sealing disc in the nearest smaller
dimension as the core drill.
10
1188 - 006 - 03.02.2020

Related product manuals