EasyManua.ls Logo

Husqvarna T425 - Page 41

Husqvarna T425
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English - 41
Leak in Fault with
Diffuser jets Needle valve
Leak in the impulse pipe Pump membrane
Ventilation hole on the Control membrane
metering unit.
Pressure testing the carburettor
Pressure testing should be carried out with the car-
burettor fully assembled. The test shall always be
done after the carburettor has been repaired, but
can also be carried out as trouble shooting before
the carburettor is taken apart.
See
gure 46 and check as follows:
1
Adjust the high- and low-speed screw to two revo-
lutions from the bottom.
2
Connect pressure tester to the carburettor fuel
inlet.
3
Submerge the carburettor into a container with
water (see gure 46).
4
Pump up the pressure to 50 kPa.
5
No leaks are permitted. In case of leaks, see the
table below.
Repair instructions
Fig 46

Other manuals for Husqvarna T425

Related product manuals