EasyManua.ls Logo

HydroTherm DYNAMIC/X8 - Page 24

HydroTherm DYNAMIC/X8
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11.2 PRE-START PROCEDURES & CHECKS
24
The DYNAMIC/X8 system is level.
The DYNAMIC/X8 system is installed on a concrete plinth or stable
capable of sustaining weights in excess of 400kgstructure
A minimum distance of 300mm is present above the DYNAMIC/X8 system, to allow
the lid to be removed for maintenance (see section 5.3 Air Flow).
A minimum distance of 600mm is present on the fan discharge side and 150mm on
A minimum distance of 50mm is present between the exterior of the tank and wall for
The condensate drainage elbow has only been hand tightened
(see section 8.0 Plumbing Installation).

connected to the PTR or any other line (see section 8.0 Plumbing Installation).
The unit is connected to either a Continuous 24 hour supply or a Shoulder Tariff
Minimum 16 hour supply. (not connected to the Off-peak 8-10 hour supply.
The plumber has explained the purpose of the tempering valve.
Once the system has been installed, the installing plumber should sign below
to ensure that all procedures have been complied to otherwise warranties
may be voided.
Once you have carried out all these checks, you are ready to
switch on your DYNAMIC/X8.

Related product manuals