EasyManuals Logo

IBC CX 150 User Manual

Default Icon
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #45 background imageLoading...
Page #45 background image
5.
Ensure that the trap upper union nut is
secured by the outlet clip.
6.
Check that all trap fittings have been
hand-tightened to prevent leakage of
flue gases. Do not use tools and over-
torque. Check for leaks.
3.10 Installing a condensate neutralizer
If discharging condensate into building drain piping materials that are subject to corrosion, use a
neutralization package.
Caution
After installing a condensate neutralization package, the pH of the condensate discharge
must be measured on a regular schedule to ensure the neutralizing agent is active and
effective.
Danger
The water in the condensate neutralizer can cause severe burns to the skin. Wear
protective gloves and eye wear when servicing the condensate neutralizer.
45
3.10 Installing a condensate neutralizer

Table of Contents

Other manuals for IBC CX 150

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBC CX 150 and is the answer not in the manual?

IBC CX 150 Specifications

General IconGeneral
BrandIBC
ModelCX 150
CategoryBoiler
LanguageEnglish

Related product manuals