6.0 Boiler operation
Before operating the appliance, there are some important pre-igntion checks that need to be
performed. For more information, see Before operating the boiler on page 73. To understand the
boiler start-up process, see Sequence of Operation on page 116. If the sight glass viewport clouds up
at start-up, see Cleaning the sight glass on page 98.
6.1 Lighting and shutting down the boiler
Start-up Checklist Check
Followed lighting and shutting down procedure.
Tested the ignition safety shutoff function (see Testing the ignition safety shutoff on page
76).
Checked the appliance's fuel source, and if necessary, performed a fuel conversion using
the appropriate P-kit.
Performed gas pressure test by measuring the inlet gas pressure.

Table of Contents

Other manuals for IBC CX 150

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBC CX 150 and is the answer not in the manual?

IBC CX 150 Specifications

General IconGeneral
BrandIBC
ModelCX 150
CategoryBoiler
LanguageEnglish

Related product manuals