EasyManua.ls Logo

IBM 5155 - Page 303

IBM 5155
450 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80 Your system unit
is
now ready for the power-on
self test (POST). Go to Section 1,
"Introduction/Installation" for a description of
this test.
Note:
If
you have any problems after the
installation, one of the following
is
the most
likely cause:
Cables are connected incorrectly.
Switches are set incorrectly.
Other options may have loosened.
The option you just installed
is defective.
Option Installation
4-75

Table of Contents

Related product manuals