EasyManua.ls Logo

IBM 9009-41A - Preparing the system for operation

IBM 9009-41A
194 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 80. Replacing the front drives and llers
7. Replace the air baffle. For instructions, see Replacing the air baffle (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_914_924_airbafflereplace.htm).
Preparing the 9009-41A, 9009-41G, 9009-42A, 9009-42G, or 9223-42H system for
operation after removing and replacing the 18-drive expanded function disk drive
backplane
To prepare the system for operation after removing and replacing the 18-drive expanded function disk
drive backplane, complete the steps in this procedure.
Procedure
1. Replace the service access cover.
For a rack-mounted system, complete the following steps. Refer to Figure 81 on page 90
.
a. Slide the cover (A) onto the system unit.
b. Close the release latch (B) by pushing it in the direction shown.
Drive backplanes for the 9009-41A, 9009-41G, 9009-42A, 9009-42G, or 9223-42H
89

Table of Contents

Related product manuals