EasyManua.ls Logo

IBM 9009-41A - Preparing the system for operation

IBM 9009-41A
194 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 145. Replacing the air baffle in a stand-alone system
Preparing the 9009-41A, 9009-41G, 9009-42A, 9009-42G, or 9223-42H system for
operation after removing and replacing a drive backplane signal cable
To prepare the system for operation after removing and replacing a drive backplane signal cable,
complete the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover.
For a rack-mounted system, complete the following steps. Refer to Figure 146 on page 164
.
a. Slide the cover (A) onto the system unit.
b. Close the release latch (B) by pushing it in the direction shown.
Drive backplane cables in the 9009-41A, 9009-41G, 9009-42A, 9009-42G, or 9223-42H
163

Table of Contents

Related product manuals