EasyManua.ls Logo

IBM RS/6000 44P 170 - Page 31

IBM RS/6000 44P 170
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. This completes the system verification. Report the SRN, if you received one, to the
service organization. To do a normal boot, turn off the system unit and wait 30
seconds, and then set the power switch of the system unit to On.
Chapter 2. Verifying the Hardware Operation 19

Table of Contents

Related product manuals