Verify environmental requirements
The environmental and electrical requirements for the physical site must be met to
ensure that your system works reliably.
Before installing a Storwize V3500 system, you must verify that adequate space in
a suitable rack is available. You must also ensure that the requirements for power
and environmental conditions are met.
This guide assumes that you have completed the physical planning for the
environment of your system. If you have not done the environmental planning for
your system, see the “Storwize V3500 physical installation planning” topic in the
IBM Knowledge Center for Storwize V3500.
Review enclosure location guidelines
Before you install the enclosure, you must be familiar with these enclosure location
guidelines.
v Position the enclosure in the rack so that you can easily view it and access it for
servicing.
v Locate the enclosure low enough for the rack to remain stable.
v Ensure that you provide a way for two or more people to install and remove the
enclosure.
8 Storwize V3500: Quick Installation Guide

Table of Contents

Other manuals for IBM Storwize V3500

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Storwize V3500 and is the answer not in the manual?

IBM Storwize V3500 Specifications

General IconGeneral
BrandIBM
ModelStorwize V3500
CategoryNetwork Hardware
LanguageEnglish

Related product manuals