v Each enclosure has two power supply units. To provide power failure
redundancy, connect the two power cords to separate power circuits.
v Review the information on securing the power cables to ensure that each
power cable is secured to each PSU on the back of the enclosure.
5. From the rear of the control enclosure, check the LEDs on each node canister
(see Figure 141).
1 Power
2 Status
3 Fault
The canister is ready with no critical errors when Power is illuminated, Status
is flashing, and Fault is off. If a canister is not ready, refer to the “Procedure:
Understanding the system status using the LEDs” topic in “Troubleshooting”.
v3500064
2
3
1
Figure 141. Node canister LEDs
Chapter 2. Installing the system hardware 155

Table of Contents

Other manuals for IBM Storwize V5030

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Storwize V5030 and is the answer not in the manual?

IBM Storwize V5030 Specifications

General IconGeneral
ModelIBM Storwize V5030
CategoryStorage
Controller Enclosures1 or 2
Maximum Drives240
RAID Levels0, 1, 5, 6, 10
VirtualizationYes
Data CompressionYes
Maximum Hosts512
Form Factor2U
Drive TypesSAS, NL-SAS, SSD
Host Interface8 Gb FC, 16 Gb FC, 10 Gb iSCSI, 12 Gb SAS
Processor Cores8 per controller

Related product manuals