Installing the upper bezel
This procedure applies only to the 5U server model with hot-swap power supplies
(Model name: 2582-F4x).
To install the upper bezel on the 5U server model with hot-swap power supplies
(Model name: 2582-F4x), complete the following steps.
1. Insert the two tabs on the right-side of the upper bezel into the corresponding
holes on the right side of the chassis.
Bezel clips
2. Rotate the upper bezel to the left side of the chassis until the bezel clips are
aligned with the corresponding indentations on the left side of the chassis and
snap them into place.
3. Install the lower bezel (see “Installing the lower bezel” on page 173).
4. Install and lock the side cover (see “Installing the side cover” on page 167).
5. Reconnect the external cables and power cords; then, turn on the attached
devices and turn on the server.
Chapter 5. Removing and replacing server components 175