Retaining
clips
Screws
9. If you are instructed to return the power-supply cage, follow all packaging
instructions, and use any packaging materials for shipping that are supplied to
you.
Installing the hot-swap power supply cage
This procedure applies only to the 5U server model with hot-swap power supplies
(Model name: 2582-F4x).
To install the hot-swap power supply cage on the 5U server model with hot-swap
power supplies (Model name: 2582-F4x), complete the following steps.
1. Place the power-supply cage into the chassis and slide it toward the rear of the
server until the retaining clips engage the top of the chassis, then install the four
screws to secure the power-supply cage to the chassis.
Chapter 5. Removing and replacing server components 249