MANUAL FOR KG20 KG6 KG6 BASIC
DRY ICE BLASTING EQUIPMENT FROM ICETECH | PAGE 11
1 Dry ice tank.
2 Compressed-air-driven
vibrator on the dry ice
tank.
3 Connector for the primary
air supply.
4 Plug for battery charger.
5 Electrical socket for the plug
on the blasting hose
(transfers signals from the
trigger switch on the blasting
gun to the machine control).
“ The high operational reliability
and efciency of the machine is
ensured by the use of high-quality
components throughout. ”
DRY ICE MACHINE
6 When lifting with a forklift,
the forks must be inserted
under the machine frame.
The cabinet bottom plate must
not be loaded in any way.
Ensure that the wheels do not
become damaged.
When using a crane for lift-
ing, a yoke with straps under
the cabinet frame must be
used.
7 When lifting manually, grasp
the handle and underneath
the front of the cabinet
simultaneously.
8 During transport, storage,
etc. the height of the machine
can be reduced by folding
down the handle.
9 Serial number.
10Buttery nut for earth
connection wire.
3
6
5
1
2
4
7
7
8
9
10