3Esprit - Installation and Servicing
DOCUMENT AMENDMENTS
Relevant Installation changes implemented in this book from Mod Level ............... A05 (Mar 08) A06 (Sep 08)
Ideal Stelrad Group reserve the right to vary specification without notice
Page 6, - Optional Extra Kits
• Additional text to include Adjustable Support Bracket
Page 10, Frame 2 - Boiler Dimensions, Services & Clearances
• Pictorial change to illustrate wall mounting template
Page 17, Frame 10 - Flue Lengths
• Additional text in notes to include information on support bracket and lubricant
Page 20, Frame 17 - Flue Extension Ducts
• Additional text to include information on lubricant
Page 22, Frame 22 - Condensate Pipe Termination Configurations
• Pictorial change to drawing 2
Page 23, Frame 23 - Condensate Pipe Termination Configurations
• Pictorial change to note 3
Page 25, Frame 26 - Roof Flue Kit Contents/Options
• Diagram change to include Flue Duct Support
Page 29 & 30, Frame 31 - Water and Gas Connections
• Pictorial changes
Page 31, Frame 34 - Electrical Connections - Installer Wiring
• Pictorial changes to Diagram A and B
Page 33, Frame 36 - Pictorial Wiring Diagram
• Colour changes made to Diverter Valve
Page 39, Frame 44 - Servicing Schedule
• Additional text added to note 4 with reference to Ionisation probes as a serviceable item
Page 47, Frame 63 - Combustion Chamber Insulation Replacement
• Additional text added to note 6 with reference to Ionisation probes as a serviceable item