INSTALLATION
40
CONDENSATE PIPE TERMINATION CONFIGURATIONS . . . continued
cla9253
BOILER
Air Break
3. INTERNAL CONNECTION TO SOIL AND VENT STACK
Termination into a down pipe can take place providing it can be confirmed that
the down pipe is part of a combined waste and rain water system.
* Make connection to SVP using a solvent welded saddle.
BOILER
External
wall
Ground Level
Termination
to Soak away
cla7774
minimum
500mm
BOILER
External
wall
Ground Level
Open end of pipe
direct into gulley
below grating but
above water level
DRAIN
cla7775
4. TERMINATION TO SOAK AWAY
5. TERMINATION TO DRAIN / GULLEY
INSTALLATION
202107-6.pmd 20/02/2008, 13:5727

Other manuals for IDEAL HE9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL HE9 and is the answer not in the manual?

IDEAL HE9 Specifications

General IconGeneral
BrandIDEAL
ModelHE9
CategoryBoiler
LanguageEnglish

Related product manuals