EasyManua.ls Logo

IDEAL LOGIC 18 - Page 50

IDEAL LOGIC 18
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50
SERVICING
Ideal Logic Heat - Installation and Servicing
65
BOILER SEALING PANEL SEAL REPLACEMENT
1. Refer to Frame 51.
2. Remove the old seal from the casing and
thoroughly clean the casing surfaces.
3. Fit the new seal, ensuring the bottom joint
provides an air tight seal.
5. Reassemble in reverse order.
6. Check operation of the boiler. Refer to
Frames 40 & 41.
Note. Ensure that the boiler front panel is
correctly sealed, compressing the seal
to make an airtight joint.
SERVICING

Other manuals for IDEAL LOGIC 18

Related product manuals