EasyManua.ls Logo

IDTECK iTDC - Wiring; Earth Ground Wiring; Itdc;Itdc-SR Power Wiring

IDTECK iTDC
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
iTDC Quick Installation Guide
Mar.11.2010
3. WIRING
Wiring must be done before main power switched on to the iTDC/iTDC-SR. Wiring after main
power switched on may cause electrical shock.
3.1 EARTH GROUND WIRING [IMPORTANT]
When installing iTDC/iTDC-SR, you must connect GND wire of Power terminal block to 1
ST
class EARTH
GROUND. EARTH GROUND wiring equalizes all ground level to zero and protects the device from the thunderbolt
or surge voltage.
(Figure: iTDC/iTDC-SR GND Wiring)
3.2 iTDC/iTDC-SR POWER WIRING
Confirm that main power switched OFF before wiring.
- Connect +12V (red) wire of DC12V power supply to Power terminal block (+12V) of iTDC/iTDC-SR.
- Connect GND (-) (black) wire of DC12V power supply to Power terminal block (GND) of iTDC/iTDC-SR.
(Figure: iTDC/iTDC-SR Power Wiring)
EARTH GND
EARTH GND
Power Supply
Caution

Other manuals for IDTECK iTDC

Related product manuals