Seite
2
5. Shipment and storage
5.1. Information and precautions for shipment
5.2. Loading, unloading, transport in plant
5.2.1. Transport with lifting truck
5.3. Check at acceptance of recipient
5.4. Packaging, insulation
5.5. Announcement and documentation of damages in transit
5.6. Place and duration of storage, security precautions
6. Installation
6.1. Place of installation, place of employment
6.2. Installation, fastening and anchoring of the filter engine
6.3. Establishment of energy and power supplies
6.3.1. Electrical power supply
7. Operation
7.1. Security features
7.2. Control and display
7.2.1. At the device
7.3. Ways of operation
7.3.1. Automation
7.4. First-time operation
7.5. Trial run
7.5.1. Preparation
7.6. Production operations
7.6.1. Switching the filter engine on
7.6.2. Switching the filter engine off
7.6.3. Running the filter engine after emergency shutdown (NOT-AUS)
8. Disturbances, troubleshooting
8.1. Avoiding disturbances
8.2. Troubleshooting
9. Maintenance and servicing
9.1. Inspection and maintenance
9.2. Cleaning of the filter engine
9.2.1. Cleansing agents
9.3. Servicing
9.4. Emergency support, customer support
10. Shutdown, dismantling, disposal
10.1. Taking the filter engine out of work
10.2. Dismantling of the filter engine
10.3. Disposal
11. Declaration of conformity to regulations of the European Community
12. Guarantee and liability
12.1. Duty of the operator
12.2. Duty of the personnel
12.3. Guarantee and liability
12.4. Copyright