EasyManua.ls Logo

INGENIA CAH - Start-up Checklist

Default Icon
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation, Operation and Maintenance Manual for Ingenia Outdoor Units CAH-OD-16-00
35
START-UP CHECK-LIST
Unit Tag:
Unit Serial Number:
Isolator shipping blocks have been removed and spring is floating
freely
Thrust restraint installation inspection
Integral/Inertia base inspection
Cement poured for Inertia base
Fan assembly (including inlet cone adjustment, if necessary)
Fan/Motor bearing lubrication (refer to OEM manual for type of grease used)
Drive alignment and belt tension
Fan/Motor rotation
Cooling coil inspection
Heating coil inspection
Steam coil inspection
Cabinet air seal verification
Field joint verification
Condensate trap design
Condensate trap installation
Heat Recovery Wheel Seals to be properly adjusted (if applicable)
(refer to wheel manufacturer IOM)
Heat Recovery Wheel Rotation and Run-out to be verified (if applicable)
(refer to wheel manufacturer IOM)