Do you have a question about the Instron 5965 and is the answer not in the manual?
Describes the main components and terminology of the testing system.
Explains how the testing system operates and the hardware controls available.
Illustrates system connections and explains safety and information labeling.
Provides contact information and lists available documentation for customer support.
Defines the responsibilities of both the customer and Instron for system setup and operation.
Details site requirements, environmental specifications, and accessibility needs.
Covers power requirements, cord selections, optional configurations, and dimensions.
Provides detailed dimensions and weights for various Series 5960 configurations.
Details accessory mounting dimensions and provides a site preparation checklist.
Guidelines for safe lifting and moving of the Instron system by experienced personnel.
Information on packaging dimensions, unpacking, and detailed procedures for moving the load frame.
Procedures for leveling the load frame and setting the input voltage.
Describes connecting basic system components like the controller, load cell, and computer.
Instructions for connecting accessories and performing the initial system configuration.
Guidelines for daily checks, periodic inspections, cleaning, and lubrication.
Procedures for general maintenance tasks like testing limit stops, replacing fuses, and troubleshooting load cells.
Lists ancillary parts included with the system, categorized by model.
Describes the main components and terminology of the testing system.
Explains how the testing system operates and the hardware controls available.
Illustrates system connections and explains safety and information labeling.
Provides contact information and lists available documentation for customer support.
Defines the responsibilities of both the customer and Instron for system setup and operation.
Details site requirements, environmental specifications, and accessibility needs.
Covers power requirements, cord selections, optional configurations, and dimensions.
Provides detailed dimensions and weights for various Series 5960 configurations.
Details accessory mounting dimensions and provides a site preparation checklist.
Guidelines for safe lifting and moving of the Instron system by experienced personnel.
Information on packaging dimensions, unpacking, and detailed procedures for moving the load frame.
Procedures for leveling the load frame and setting the input voltage.
Describes connecting basic system components like the controller, load cell, and computer.
Instructions for connecting accessories and performing the initial system configuration.
Guidelines for daily checks, periodic inspections, cleaning, and lubrication.
Procedures for general maintenance tasks like testing limit stops, replacing fuses, and troubleshooting load cells.
Lists ancillary parts included with the system, categorized by model.
| Load Cell Accuracy | ±0.5% of reading down to 1/100 of load cell capacity |
|---|---|
| Control | Bluehill Universal Software |
| Actuator Drive System | Electromechanical |
| Crosshead Speed Range | 0.001 to 500 mm/min |
| Test Speed Range | 0.001 to 500 mm/min |
| Data Acquisition Rate | Up to 1 kHz |
| Power Requirements | 100-240 VAC, 50/60 Hz |