EasyManua.ls Logo

Instron 5965 - Chapter 2 Requirements and Specifications; Responsibilities

Default Icon
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-1
Chapter 2
Requirements and Specifications
Responsibilities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Site Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
Environmental Specifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
Power Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
Power Cord Selections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
Series 5960 Optional Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10
Series 5960 Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11
Load Frame Weights. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-17
Accessory Mounting Dimensions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-19
Checklist for Site Preparation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23
Responsibilities
Customers Responsibilities
It is the customers responsibility to ensure that all required support services are available,
and that all necessary checks are made prior to installing the testing system. These services
and checks are described below.
Site Preparation
Proper site preparation is imperative so that the testing system operates in accordance with
its specifications and provides accurate test results. The customer must ensure that the site
requirements are satisfied prior to scheduling the installation appointment (refer to “Site
Requirements” on page 2-3).
Handling and Transporting
Unless specifically arranged otherwise, it is the customers responsibility to arrange the off-
loading, unpacking and moving of the testing system to the final site location (refer to
Chapter 3 “Lifting and Handling”).

Table of Contents

Related product manuals