Do you have a question about the Instron 5960 Series and is the answer not in the manual?
Brand | Instron |
---|---|
Model | 5960 Series |
Category | Test Equipment |
Language | English |
Hazards from crush risk due to moving parts.
Hazards from flying debris due to specimen failure.
Hazards related to electrical connections and damage.
Hazards from extreme operating temperatures.
Hazards associated with robotic device movements.
Hazards from rotating machinery components.
Hazards from hydraulic fluid and compressed gas systems.
Hazards from specimen failure, explosion, and fatigue.
Details about system components and definitions.
How system components are connected.
Meanings of safety and information labels.
Information on obtaining documentation and assistance.
Outlines customer and Instron responsibilities for setup.
Specifies environmental and physical conditions for installation.
Details operating and storage environmental parameters.
Specifies electrical power needs for the system.
Lists available power cord types and receptacles.
Describes available frame options and combinations.
Provides dimensional data for standard and optional configurations.
Lists the weights of standard and optional load frame models.
Details mounting hole locations for accessories.
Summarizes key considerations for preparing the testing site.
Guidelines for experienced personnel handling lifting equipment.
Dimensions and weights of packaged frames for transport.
Step-by-step procedure for unpacking the load frame.
Procedures and methods for safely moving the load frame.
Instructions for leveling the load frame after positioning.
Procedure for verifying and changing system input voltage.
Describes connections for basic system components.
How to connect optional accessories to the machine.
Steps for initial system configuration and software setup.
Guidelines for periodic inspection, cleaning, and lubrication.
Procedures for daily and periodic system inspections.
Procedures for cleaning and lubricating key components.
Procedures for routine maintenance tasks.
Diagnosing load cell issues and listing ancillary parts.