EasyManua.ls Logo

Instron 5967 - User Manual

Default Icon
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
5960 Series Dual Column Table Frames
System Support M10-16248-EN Revision E
The difference is measurable
®

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Instron 5967 and is the answer not in the manual?

Summary

Chapter 1 Introduction

System Description and Terminology

Overview of system components, diagrams, and basic terminology for the testing machine.

System Safety and Information Labeling

Explains safety labels and their meanings, crucial for hazard awareness and safe operation.

Chapter 2 Requirements and Specifications

Site Requirements

Details essential environmental, space, power, and accessibility requirements for the testing system's location.

Checklist for Site Preparation

A summary checklist to ensure all site conditions and preparations are met before testing system installation.

Chapter 3 Lifting and Handling

General Handling Precautions

Essential safety guidelines and requirements for personnel involved in lifting and moving the testing system.

Transporting Dual Column Frames

Covers pre-transport checks, equipment, and procedures including frame base, crosshead, and crane methods.

Chapter 4 Installation

Level the Load Frame

Instructions to level the load frame after positioning to prevent rocking and ensure accurate test results.

Set the Input Voltage

Procedures to verify and adjust the system's input voltage and electrical plug for compatibility with the site's power.

Chapter 5 Maintenance

Summary

Chapter 1 Introduction

System Description and Terminology

Overview of system components, diagrams, and basic terminology for the testing machine.

System Safety and Information Labeling

Explains safety labels and their meanings, crucial for hazard awareness and safe operation.

Chapter 2 Requirements and Specifications

Site Requirements

Details essential environmental, space, power, and accessibility requirements for the testing system's location.

Checklist for Site Preparation

A summary checklist to ensure all site conditions and preparations are met before testing system installation.

Chapter 3 Lifting and Handling

General Handling Precautions

Essential safety guidelines and requirements for personnel involved in lifting and moving the testing system.

Transporting Dual Column Frames

Covers pre-transport checks, equipment, and procedures including frame base, crosshead, and crane methods.

Chapter 4 Installation

Level the Load Frame

Instructions to level the load frame after positioning to prevent rocking and ensure accurate test results.

Set the Input Voltage

Procedures to verify and adjust the system's input voltage and electrical plug for compatibility with the site's power.

Chapter 5 Maintenance

Instron 5967 Specifications

General IconGeneral
BrandInstron
Model5967
CategoryTest Equipment
LanguageEnglish

Related product manuals