EasyManua.ls Logo

Instron 5969 - User Manual

Default Icon
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
5960 Series Dual Column Table Frames
System Support M10-16248-EN Revision E
The difference is measurable
®

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Instron 5969 and is the answer not in the manual?

Summary

Chapter 1 Introduction

System Safety and Information Labeling

Explains the significance of all safety and informational labels present on the testing equipment.

Chapter 2 Requirements and Specifications

Site Requirements

Specifies essential environmental, power, and space requirements for testing system installation.

Power Requirements

Lists the system's electrical specifications, including voltage, frequency, and maximum power usage.

Chapter 3 Lifting and Handling

General Handling Precautions

Outlines critical safety measures and operator qualifications for lifting and moving the testing system.

Transporting Dual Column Frames

Details procedures, equipment, and checks required for safely transporting the dual column load frames.

Chapter 4 Installation

Level the Load Frame

Instructions for leveling the load frame after placement to ensure accurate test results.

Set the Input Voltage

Procedures for verifying and adjusting the system's voltage to match the facility's power source.

First Time Startup

Steps for initial system setup, including software configuration and hardware communication.

Summary

Chapter 1 Introduction

System Safety and Information Labeling

Explains the significance of all safety and informational labels present on the testing equipment.

Chapter 2 Requirements and Specifications

Site Requirements

Specifies essential environmental, power, and space requirements for testing system installation.

Power Requirements

Lists the system's electrical specifications, including voltage, frequency, and maximum power usage.

Chapter 3 Lifting and Handling

General Handling Precautions

Outlines critical safety measures and operator qualifications for lifting and moving the testing system.

Transporting Dual Column Frames

Details procedures, equipment, and checks required for safely transporting the dual column load frames.

Chapter 4 Installation

Level the Load Frame

Instructions for leveling the load frame after placement to ensure accurate test results.

Set the Input Voltage

Procedures for verifying and adjusting the system's voltage to match the facility's power source.

First Time Startup

Steps for initial system setup, including software configuration and hardware communication.

Instron 5969 Specifications

General IconGeneral
BrandInstron
Model5969
CategoryTest Equipment
LanguageEnglish

Related product manuals