Chapter: Requirements and Specifications
2-24 M10-16248-EN
You have the required equipment for the chosen transporting method.
You have the appropriate packaging to protect the load frame when moving or relocating
it.
Pathway from the loading dock to the final site location has sufficient width and height
to fit the frame and forklift (or crane). Measure all doors and hallways. If you transfer
the load frame while it is still in its packaging, refer to “Packaging Dimensions” on
page 3-2. If you move or relocate the load frame without its packaging, refer to the
dimensions for your specific model number, “Series 5960 Dimensions” on page 2-
11.
Floor area along the pathway to the final site location is able to support the weight of the
frame and forklift (or crane). Refer to “Packaging Dimensions” on page 3-2 for the
total package weight of your frame or to the weight specification for your specific model
number, “Load Frame Weights” on page 2-17.
There are no loose accessories on the shipping skid or frame.
Your equipment operators have the appropriate licenses and have complied with your
local safety standards (i.e. the appropriate training required by OSHA in the U.S.).
Scheduling Installation
When the testing site is ready, and the frame has been moved to its final operating location,
contact Instron Professional Services to schedule an installation appointment:
Worldwide Contact your local Instron Sales and Service office.
A list of Instron offices is available on our website at
www.instron.com.
In the United States
& Canada:
1-800-473-7838