EasyManua.ls Logo

Instron 5969 - Chapter 1 Introduction

Default Icon
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-1
Chapter 1
Introduction
• System Description and Terminology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
• System Components and Interconnections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
• System Safety and Information Labeling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6
• Product Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8
• Product Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8
These instructions include the following information:
• system specifications that are required for installation of your testing system, for
example required environmental conditions, system weights and dimensions
• transporting your system to its final location, including instructions for lifting and
handling
• installing and connecting all the system components together (carried out by an Instron
Service Engineer for first-time installation)
• configuring the system before you start testing (carried out by an Instron Service
Engineer for first-time installation)
• routine maintenance of the system
• spare parts
Refer to the Operator’s Guide for instructions on running tests.

Table of Contents