Installation and Set-Up Recommendations
1. Modules should be plugged into or hardwired into the
location where they will be used.
2. For best results, do not move or relocate modules after
they have been included into the network. If you wish to
re-locate or move a module from a particular location,
first delete it from the network, then include it back to
the network after you have re-located it.
3. Devices should be plugged into modules before adding
modules to the network. Devices (for example, lamps)
should be turned to the ON position.
4. Controllers must be brought within 6 ft. of modules
during set-up. This is because during set-up, the
controller communicates with the modules using low
radio transmission power. This helps provide additional
security when setting up your network.
5. HA06 Dimmer Switches have a 40-Watt minimum lamp
requirement.
Creating a Network
NOTE: Creating a network refers to assigning modules to
the master controller. All modules must be assigned to the
master controller before any programming or remote control
functions can be accomplished.