(17PO) AP619D/AP619DP-22 ELECTRIC PUMP ENGLISH 4.875” X 7.25” 12/04/2021
English
17PO
READ AND SAVE THESE INSTRUCTIONS
Page 3
3. Turn the control dial fully clockwise until it stops. The pump turns on automatically to
inflate the airbed.SeeFig(3).
4. When the airbed is fully inflated, turn the control dialback(counterclockwise)tothe
center position which closes the valve and turns the pump off. SeeFig(4).
NOTE: Turning the control dial either direction while the pump is unplugged will let air
escapefromtheairbed.Seestep#5forfirmnessadjustmentinstructions.
Never disconnect the power cord from the electrical outlet while the pump is running. Rotate
control dial to the closed / pump off position before disconnecting the power cord.
5. If the airbed feels too firm, release some air by simply turning the control dial gradually
counterclockwise until air begins to escape from the air passage. When the desired
firmness is achieved, turn the control dial back to the center closed / pump off position. If
the airbedfeelstoosoft,repeatsteps#3to#5asnecessary.
INFLATION
1. Open cord compartment cover and remove power cord. Do not yank on the cord.
SeeFig(1).
2. PlugintheACpower cordintoanACelectricaloutlet.SeeFig(2).
FIG (1)
FIG (2)
110V–120V
220V–240V
√
FIG (3)
Inflate
Position
FIG (4)
RotatetoClosed/PumpOffPosition