EasyManua.ls Logo

INTORQ BFK-458-12E - Page 40

Default Icon
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical installation5
j | BA 14.0168 | 10/2013
40
5.2.3 Reduced switch-off times
When switching on the DC side (fast engagement), switching on the AC side is also required!
Otherwise, there will be no overexcitation during power-on.
Delayed engagement Fast engagement
1234 65
 
12 34 65
Mains Bridge Coil
5.2.4 Permissible c urrent load - ambient temperature
BFKXXX-008.iso
1 For screw assembly with metal surface (good heat dissipation)
2 For other assembly (e.g. glue)
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.actechdrives.com - Email: info@actechdrives.com