EasyManua.ls Logo

Ispring UVF11A - Final Installation Checks

Ispring UVF11A
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note: Cut the 1/4'' tubing (not included) using a sharp blade to an appropriate length to
avoid kinking. Ensure the tubing is fully inserted into the quick-fitting connection about half
an inch deep and secure the connection with the supplied blue clips.
Perform the following steps to complete the installation process:
a. After completing all plumbing connections, slowly turn on the water supply and check
for leaks. Also, check to see if water flow activates the UV light.
b. Allow the water to run for a few minutes to clear any air or dust potentially in the
reactor chamber.
c. Plug in the power for starting up.
d. The system is now ready to use.
The completed system connection should be as shown below.
www.123filter.com | (678) 261-7611 | support@123filter.com Page 11

Other manuals for Ispring UVF11A

Related product manuals