JacuzziSignatureWaterHeatersJ‐S180/J‐S199 5
PrepareforInstallaon
Partsincluded
Toolsneeded
Materialsneeded
• Theappliancemustbeisolatedfromthegassupply
pipingsystembyclosingitsindividualmanual
shutoffvalveduringanypressuretesngofthegas
supplypipingsystemattestpressuresequaltoor
lessthan1/2psi(3.5kPa)(13.84inW.C.).
• Youmustfollowtheinstallaoninstruconsand
thoseinCare and Maintenanceforadequate
combusonairintakeandexhaust.
INFORMATION
• Ifawaterheaterisinstalledinaclosedwater
supplysystem,suchasonehavingabackflow
preventerinthecoldwatersupplyline,means
shallbeprovidedtocontrolthermalexpansion.
Contactthewatersupplierorlocalplumbing
inspectoronhowtocontrolthermalexpansion.
• Shouldoverheangoccurorthegassu pplyfailto
shutoff,turnoffthemanualgascontrolvalveto
theappliance.
• Keeptheairintakelocaonfreeofchemicalssuch
aschlorineorbleachthatproducefumes.These
fumescandamagecomponentsandreducethelife
ofyourappliance.
• Tanklesswaterheater
• J‐C100temperaturecontroller(integratedinto
indoormodels;providedwithoutdoormodels)
• Pipewrenches(2)
• Adjustablepli ers
• Screwdrivers(2)
• Wirecuers
• Gloves
• Safetyglasses
Toolsthatmightbeneeded
• Hammerdrillwith
concretebits
• Saw
• Threadingmachinewith
headsandoiler
• Coredrillwithdiamond
head
• Torchset
• Coppertubingcuer
• Steelpipecuer
Materialsthatmaybeneeded
• Soapsoluon
• Approvedvenng
• Pressurereliefvalve
• Teflontape
(recommended)orpipe
compound
• Heattape
• Pipeinsulaon
• Electricalwireand
conduitperlocalcode
• Concretewallanchors
• Oponalpipecover
• Oponaltemperature
controller
• 5/8”IDPVCflexible
tubing
• 2conductor22AWG
wireforcontroller
• Singlegang electrical
box
• Wirenuts
• Unions,drainvalves,
isolaonvalves