42/154
119635
Index G
OPERATION
STERN ANCHORING
Stern anchoring shall be performed with the engine declutched.
- Secure the required length of cablet on the mooring cleat.
- Pay out the anchor line slowly.
- Take care not to damage the propeller or the rudder.
Battery switches to be turned on:
1. Common negative
2. Positive engine
The windlass is powered by the engine
battery.
Access
Operation relay -
Skipper's cabin
Breaker -
Port aft cabin
ADVICE - RECOMMENDATION
- After each trip rinse the windlass and anchor chain or rode with fresh water.
- Check the swinging area once the boat is at anchor.