EasyManuals Logo

Jerr-Dan MPL-NG User Manual

Default Icon
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #61 background imageLoading...
Page #61 background image
Section 4: Operation
5376000253 4-29
4.9 RECOVERY WINCH OPERATION (OPTIONAL)
The MPL-NG recovery winch is an extremely e󰀨ective tool in recovery or
retrieval prior to lifting and towing. To operate the winch e󰀨ectively, care and
thought must be given.
1. Check the direction you wish
the work to travel, being sure
there are no major obstacles in
the way.
2. Position and align the truck
to obtain as direct a pull as
possible. Straight line pulls are
the best and most e󰀩cient.
3. Set the brakes on your Jerr-Dan
unit. The use of wheel chocks
is also recommended.
4. Unfold the underlift boom.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Jerr-Dan MPL-NG and is the answer not in the manual?

Jerr-Dan MPL-NG Specifications

General IconGeneral
BrandJerr-Dan
ModelMPL-NG
CategoryConstruction Equipment
LanguageEnglish