EasyManua.ls Logo

Jerr-Dan MPL40 - Tow Sling - Lowering and Positioning

Jerr-Dan MPL40
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section II: Operation
Page 51
5-376-000086
REV. 4 - 07/10
9. Lower the boom to allow the
tow sling head to raise out of it
holder on the back side of the
boom.
10. Carefully extend and lower the
wrecker boom to allow the tow
sling head to rotate outward and
down away from boom.
11. Lower the tow sling to the
ground.