Section II: Operation
Page 56
5-376-000086
REV. 4 - 07/10
26. Remove the pins from the hold
back bars at the rear of the body.
27. Swing the hold back bars in
toward the tow sling storage
brackets on the side of the boom.
Allow the hold back bars to
retract as necessary.
28. Connect the hold back bars to
the tow sling storage brackets
using the pins that you removed
earlier.