Installation and operation of the Mynx
Heat insulation.
It is important that all safety distances
referred to in this manual are adhered
to.
Combustible materials that are within
the safety distances must be insulated
to prevent it from being exposed to the
heat from the unit.
It is recommended that covering it with
ceramic wool should insulate the
complete flue run inside the roof cavity.
If the complete flue run inside the roof
cavity is not insulated, care should be
taken to ensure that all combustible
materials are protected. It must also be
noted that heat will build up throughout
the roof cavity to levels that might be
damaging in the long run.
g) Finishing.
The ceiling must be finished by fitting
the escutcheon plate around the flue
pipe onto the ceiling.
The escutcheon plate comes in 2
sections. Each section is fastened onto
the ceiling board.
Hold the escutcheon plate in place and
mark where the 6 holes should be cut
for the 6 screws.
Cut holes large enough to let the spring-
loaded toggle screw legs through. A
Ø16mm hole should be adequate.