EasyManua.ls Logo

JFY tech JSI-2000TL - 2 Installation; Package Inspection; Selecting the Place of Installation

Default Icon
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.JFY-tech.com
8
2. INSTALLATION
WARNING: The electrical installation of JSI inverter must be performed in
compliance with applicable local and national standards and laws.
WARNING: The connection of JSI inverter to the AC grid must be
performed only after receiving authorization from the utility that operates
the grid.
2.1 Package Inspection
The customer is encouraged to perform the following checks:
Inspect the package box fo
r
apparent damage, such as holes, cracking o
r
any
sign of possible damage to its contents.
Describe any damage o
r
shortage on the receiving documents and have the
carrier sign his/her full name.
Open the package box and inspect the contents fo
r
internal damage. While
unpacking, be careful not to discard any equipment, parts or manuals. If any
damage is detected, call the delivering carrier to determine the appropriate
action. Save all shipping material for the event the carrier sends an inspector
to verify damage!
If the inspection reveals damage to the inverte
r
, please call you
r
local supplie
r
or the authorized distributor. They will determine if the equipment should be
returned for repair. They will also provide instructions on how to get the
equipment repaired;
It is the custome
r
’s responsibility to file a claim with the carrier. Failure to file a
claim with the carrier may void all warranty service rights for any damage;
Carefully store the original packaging of JSI inverte
r
sinceitshallbeusedin
case it is necessary to ship it for repair.
2.2 Selecting the place of installation
Place of installation should be selected based on the following considerations:
JSI inverters shall be set at a suitable height from the ground to enable easy
readout view of the display and the LEDs.
Select a well ventilated place sheltered from direct sun radiation. Choose a
place that allows fluent air flow around the unit.
Allo
w
sufficient room around the unit to enable easy installation and removal of
the object from its mounting surface.
The following figure shows the recommended minimum clearances around the
inverter:

Related product manuals